DRITZ 783 Ball Point Bodkin
DRITZ 783 Ball Point Bodkin

DRITZ 783 Ball Point Bodkin

Write a Review
Your Price: $3.95
Part Number: 072879111224
Availability: In Stock
Turn bias tubing, insert elastic into casings, weave ribbon.Instructions:BIAS TUBING - Insert ball point of bodkin in closed end of tubing. Push bodkin through center of tubing, gradually turning tubing to inside. Remove bodkin after tube is completely turned. ELASTIC - Insert elastic into eye of bodkin. Slide bodkin (ball point end first) through casing, stitch ends of elastic to secure. TIP - Pin loose end of elastic to avoid pulling through casing. RIBBON WEAVING - Insert ribbon into eye of bodkin. Use ball point to weave ribbon through trim or eyelets.

072879111224

Related Items

Recently Viewed Items

TOP